国产精品亚洲色婷婷99久久精品,人妻丰满熟妇AV无码区动漫 ,亚洲熟女综合一区二区三区,成人香蕉视频网站

The current position:Home > Products > Laboratory electric furnace > GSX Series of energy-efficient high-temperature sintering electric furnace

Click to enlarge

GSX Series of energy-efficient high-temperature sintering electric furnace

RELATED ARTICLES
Introduction

 
 
               
 
Applicable to laboratory and industrial inorganic materials sintered in the furnace, especially for zirconia, alumina, industrial production, the use of new materials and new design, the energy saving effect creating a new energy-saving electric furnace milestone.
     , The furnace power consumption is 25-30%, greatly saves energy and reduces the cost of the ordinary electric furnace.
     Second, shorten the production cycle. The electric furnace to save 50% and shorten the production cycle of the cooling time
     , Furnace uniformity product appearance
     Fourth, lift smooth, easy loading and unloading products.
 
型  號 規(guī) 格
爐膛尺寸
長/寬/高mm
額定燒結(jié)溫度
功     率
kw
控制方式
GSX-1-13,16
300/300/300
1350,1650
12,15
32段程控
GSX-2-13,16
400/400/400
1350,1650
18,25
32段程控
GSX-3-13,16
600/600/600
1350,1650
30,40
32段程控
GSX-4-13,16
800/800/800
1350,1650
40, 60
32段程控
 可定制各類尺寸、溫度的非標電爐
 
 
 
 
     
Example:
 
  
      I should Zhuzhou requirements of a company (production of zirconia, alumina, industrial supplies), 400/350/600 electric furnace production in 2005, and for small batch firing achieve good energy saving effect and shorten the production cycle basis on the design and manufacture. Its energy-saving effect creating a new energy-saving electric furnace milestone.
     The lift furnace design effective volume 600/600/600mm, 1650 ℃, ordinary electric furnace of the same specifications produced by a company of Yixing:
     An ordinary electric furnace to complete sintering (40 hours) to about 1000 degrees power, the new furnace When sintering was complete (40 hours) of about 230 degrees of power, savings of 770 degrees. Significantly save energy and reduce costs.
     Second, shorten the production cycle. Ordinary electric furnace to complete cooling takes about 3-4 days, new electric furnace to complete the cooling time is about 1-2 days. Two days, saving time and shorten the production cycle
    Third, the furnace temperature uniformity and appearance of the product after sintering
    Fourth, lift smooth, easy loading and unloading products. 
 
 
 
 

 

 

 

 
 
 
 
 


 
 
點擊次數(shù):897

 

Order

留言框

  • Theme:

  • Content:

  • Commpany:

  • Name:

  • Telephone:

  • Email:

  • Address:

  • Province:

  • Verification Code:

Contact

Email:130732189@qq.com
Address:Add:No.168 Xiaotang east road,German Industrial Park,Xiangtan City,Hunan,China
WeChat scan focuses on us:
Service Contact Code

Hotline

86+0731-58534888,86+13607322318

Sweep and pay attention to us.

江口县| 鲁山县| 芮城县| 兴海县| 祁东县| 温宿县| 樟树市| 彩票| 无为县| 隆林| 胶南市| 上蔡县| 梁平县| 扎囊县| 图木舒克市| 墨玉县| 广安市| 广东省| 栖霞市| 茌平县| 亳州市| 东乡族自治县| 皋兰县| 自贡市| 大名县| 丰都县| 察隅县| 青浦区| 垫江县| 门源| 洮南市| 白玉县| 长治县| 蒙自县| 霍州市| 无锡市| 肥西县| 长垣县| 盐亭县| 当阳市| 朔州市|